Manchester City Data Centres (DC6 & DC7)

Enterprise-grade colocation, purpose-built for performance, compliance, and control - without the overheads of on-prem.

Secure, Resilient Infrastructure in Central Manchester

Our Manchester City Data Centres - Turing House (DC6) and Reynolds House (DC7) - provide secure, high-availability colocation facilities designed to support resilient, business-critical environments.

Strategically located in central Manchester with strong carrier connectivity and proximity to major transport links, DC6 and DC7 offer organisations a robust dual-site solution for enhanced redundancy, disaster recovery and operational continuity.

Built to Tier 2 standards and engineered for reliability, both facilities deliver the performance, security and scalability modern businesses demand.

0 /7

Round-the-Clock Monitoring

24-hour on-site Network Operations Centre (NOC)

0

Tier 2 Facilities

Combined 1,080 m² Tier 2 facility space across Turing House (DC6) and Reynolds House (DC7)

0 kV

Power and Backup

Equipped with an 11,000 V power supply, redundant UPS systems, and backup generators to ensure continuous, high-availability operation.

Key Highlights 

Turing House (DC6)

  • Strategic Location: Situated within Manchester’s dynamic business hub, our 300m², tier 2 facility benefits from easy access via the M60 and Manchester Piccadilly station, making it ideal for businesses requiring close connectivity.
  • Power Resilience: Features dual 11,000-volt and 6.6kV power supplies with N+1 UPS systems and backup generators, ensuring uninterrupted power for mission-critical operations.
  • Advanced Connectivity: Equipped with diverse fibre entry points and direct peering with key exchanges like LINX and Equinix, DC6 delivers high-speed, low-latency connectivity. 

  • 2 x diverse fibre routing into the Data Centre via multiple carriers 
  • Cross Connection to several Tier 1 carriers 
  • Direct peering interconnection to London LINX, Telehouse and Equinix facilities 
  • Direct private Fibre links to DC7 
  • Truncated internal cable network 
  • ODF / DDF (Optical Distribution Frame / Digital Distribution Frame) bandwidth 
  • Internal inventory systems track all cables, circuits and cross-connects 
  • Scalable architecture including multiple redundant core switches and routers

  • 1 x 500kVA 11000volt power supply into the site 
  • 1 x 570kVA generator 
  • 5 x 160kVA UPS plus battery backup systems 
  • Generator can operate on full occupancy for an initial 24 hours 
  • Fuel replacement contract with multiple suppliers delivering a 10-hour SLA 
  • PUE – 1.5

  • N+1 redundant Computer Room Air Conditioning (CRAC) system 
  • Fully redundant air handling units provide constant fresh airflow 
  • 10kW/m² cooling density 
  • Controlled Environment – room temperature 24°C +/- 2°C 

  • BT 
  • CenturyLink 
  • Gamma 
  • The Loop 
  • Vodafone (Cable & Wireless) 
  • SSE 
  • Zayo

  • 24-hour on-site Network Operations Centre (NOC) 
  • 10 plus staff on-site during key working hours 
  • Out of hours – approx. 2 staff supported by Group UK-wide NOC in Glasgow

  • Data Centre is manned and monitored on a 24 x 7 x 365 basis 
  • No external indication of the use of the facility 
  • Data hall access requires a Proximity Card 
  • Internal and external CCTV systems – 90 days recording in line with PCI DSS 
  • Security breach alarms 
  • Dual-zone fire detection equipped with FM200 Gas Fire suppression system 
  • VESDA system located throughout the Data Centre 
  • Double knock system, which ensures that it takes 2 alerts to trigger activation 
  • Fire alarm buttons are located at each access and egress point 
  • Activation does not affect critical power to the data halls 
  • Under-floor leak detection

Key Highlights 

Reynolds House (DC7)

  • Enhanced Redundancy:Part of Iomart’s dual-site configuration with DC6, this 300m², tier 2 facility offers robust data protection and continuity for clients with high uptime demands.
  • Scalable Infrastructure: Built with flexible ODF/DDF systems and redundant core switches to support growing businesses and evolving technological needs.
  • Environmental Efficiency: Operates at a PUE of 1.5, integrating N+1 CRAC cooling systems and advanced energy management to reduce operational costs. 

  • 2 x diverse fibre routing into the Data Centre via multiple carriers 
  • Cross Connection to several Tier 1 carriers 
    Direct peering interconnection to London LINX, Telehouse and Equinix facilities 
  • Direct private Fibre to DC6 
  • Truncated internal cable network 
  • ODF / DDF (Optical Distribution Frame / Digital Distribution Frame) bandwidth 
  • Internal inventory systems track all cables, circuits and cross-connects 
  • Scalable architecture including multiple redundant core switches and routers

  • 1 x 500kVA power supply from building Energy Centre 
  • 2 x 2MVA generator for building 
  • 5 x 100kW UPS 
  • Generator can operate on full occupancy for an initial 24 hours 
  • Fuel replacement contract with multiple suppliers delivering a 10-hour SLA 
  • PUE – 1.5

  • N+1 redundant Computer Room Air Conditioning (CRAC) system 
  • Fully redundant air handling units provide constant fresh airflow 
  • 10kW/m² cooling density 
  • Controlled Environment – room temperature 24°C +/- 2°C

  • BT 
  • CenturyLink 
  • Gamma 
  • The Loop 
  • Vodafone (Cable & Wireless) 
  • SSE 
  • Zayo

  • 24-hour on-site Network Operations Centre (NOC) 
  • 10 plus staff on-site during key working hours 
  • Out of hours – approx. 2 staff supported by Group UK-wide NOC in Glasgow

  • Data Centre is manned and monitored on a 24 x 7 x 365 basis 
  • No external indication of the use of the facility 
  • Secure 3-metre-high perimeter fence 
  • Access controls at all pedestrian and vehicle access points 
  • Data centre and hall access requires Proximity Card 
  • Internal and external CCTV systems – 90 days recording in line with PCI DSS 
  • Security breach alarms 
  • Dual zone fire detection equipped with FM200 Gas Fire suppression system 
  • VESDA system located throughout the Data Centre 
  • Double knock system which ensures that it takes 2 alerts to trigger activation 
  • Fire alarm buttons are located at each access and egress point 
  • Activation does not affect critical power to the data halls 
  • Under floor leak detection

Our Manchester Data Centres Certifications

Why Choose Iomart for Colocation

Modern businesses need modern infrastructure. Here's why organisations are making the move:

Extensive UK Presence

12 data centres across the UK

Expertise You Can Trust

Over 25 years of hosting and infrastructure expertise

Trusted by Leaders

Trusted by leading cross-sector organisations

Seamless Cloud Integration

Direct cloud connectivity to Azure, AWS, VMware, and more

Dedicated UK Support

UK-based support teams and enterprise SLAs

Certified & Secure

Scale on your terms with technology designed to grow alongside your business.

Discover Iomart’s UK Data Centres

Our nationwide network of 12 strategically placed data centres ensures you have access to secure, high-performance infrastructure wherever your business needs it.

Manchester Trafford Wharf Data Centre (DC13) – Tier 2

Strategically positioned in Manchester’s key digital hub, offers secure, resilient connections to Tier 1 carriers and direct access to the city’s dedicated fibre network, The Loop, supporting high-demand, mission-critical workloads.

Central London Data Centres

Central London Data Centre (DC2) – Tier 3

Located in the heart of London’s financial district, this enterprise-class facility provides a secure, high-availability environment for mission-critical applications.

Maidenhead Data Centres

Maidenhead Data Centre (DC5) – Tier 3

As Iomart’s largest facility, located near Maidenhead’s town centre, this site spans eleven data halls with robust connectivity to national and international networks.

Ready to Leave On-Prem Behind?

Talk to our team about secure, scalable colocation today.